delhibreakings delhi dehradun greenfield highway inauguration update april 2026 Delhi-Dehradun Greenfield Highway Opening in April: Travel Time to Reduce to 2 Hours, Incomplete Rest Areas a Concern

The Delhi-Dehradun Greenfield Highway is entering its final stages of preparation for a grand opening scheduled for the first week of April 2026. Prime Minister Narendra Modi is expected to inaugurate the 210-km long expressway, which will significantly reduce the travel time between the two cities from nearly six hours to just 2.5 hours. While the National Highways Authority of India (NHAI) has intensified cleaning and painting work, several roadside amenities are still under construction.

ℹ: Delhi NCR Weather Alert: IMD Forecasts Heavy Rain and Strong Winds on March 29 and 30

Key Features and Travel Guidelines of the New Highway

The highway is designed to transform regional mobility while maintaining ecological balance. It features Asia’s longest elevated wildlife corridor, spanning 12 km through Rajaji National Park, to allow for the safe movement of animals. The project has been completed at an estimated cost of ₹11,970 crore and includes several modern safety features.

Feature Details
Maximum Speed (Cars) 100 km/h
Maximum Speed (Trucks) 80 km/h
Total Length 210-212 km
Estimated Project Cost ₹11,970 crore
Toll (FASTag Annual Pass) ₹60
Toll (Without Annual Pass) Approximately ₹500

Status of Parking and Modern Amenities Along the Route

Despite the fast-approaching inauguration date, the construction of parking and rest areas remains incomplete. NHAI is currently inviting bids and planning facilities that will include clean restrooms, first-aid rooms, drinking water, and food outlets. These designated rest stops will also feature dedicated electric vehicle (EV) parking bays, occupying 10% of the total space, alongside solar-powered lighting and electronic parking fee systems.

Currently, six helipads are being prepared near the Forest Research Institute in Dehradun to facilitate the Prime Minister’s arrival. NHAI teams are working round the clock on ground-level preparations, including waste removal and the construction of service roads. Three specific parking sites near the East Delhi District Magistrate’s office, Geeta Colony, and Gandhi Nagar Market are also part of the final development phase.

Gautam Sahu is a journalist and reporter at DelhiBreakings.com, covering Delhi NCR affairs and topics of wide public interest. He focuses on civic issues, public updates, and developments that directly affect everyday citizens.

He previously worked with Jagran Media (in-house) for four years and is a graduate of the Indian Institute of Mass Communication (IIMC), New Delhi (2016 batch). His reporting experience combines newsroom discipline with a strong understanding of ground-level public issues.

His areas of coverage include:

Delhi NCR local news and civic matters

Public announcements and policy updates

Finance-related developments affecting consumers

Automobile updates and mobility-related news

You can connect with him here:
LinkedIn: https://www.linkedin.com/in/gautam-sahu-57a0853a8/
X (Twitter): https://x.com/GautamSahuDelhi